I had a weather window this morning form 1030 to 1200. This morning's rain was on its way to Northampton and the next shower was not due to arrive form Stratford-on-Avon until afternoon.
I went and collected the SONFLOWER from her mooring near Samuelson Bridge and took her up to the Grimsbury Arm turning point and back to Tooley's boatyard. I had a great assist at lick and lift bridge form the crew of a hire boat that had gone the other way to Bankside turning point. After lunch in General Foods Club, as it is Wednesday, I met John and Matt to discuss the details and handed over the keys.
So she is in dock for survey, blacking and painting and will be there until early May. Herbie wants pictures.
I will see what I can do.
1.1/2 miles, 1 lock, 1 lift bridge, 1hr
Winwick
3 hours ago