John worked on the boat on Thursday and Friday to replace the engine foot (including a difficult withdrawal of the broken stud),

to sleeve the main cable loom where it passes through the bulkhead from engine bay to cabin,
and to clip insecure gas piping with a clip within 6 inches of every joint.
All that completed, we took our granddaughter for a ride this afternoon to turn the boat round ready for return to hime mooring via Sovereign Wharf on Monday.
1.1/2 Miles; 2Locks, 2 LB, 2 hrs