The Boat Safety Scheme Examination yesterday resulted in a failure!
1. ENGINE : the front RH mounting foot is cracked, a stud has sheared and the mounting collapsed.
2. GAS SYSTEM: a few clips are missing
3. ELECTRICAL WIRING A wiring loom has no protection (grommet) where it passes through the bulkhead
The expected call to Tooley's Boatyard has been made and cruising is suspended for the near future.
Test
11 hours ago
No comments:
Post a Comment